Skip to main content
23th to 25th of May 2028
19th, 20th & 21st
MAY 2026

- CONFIRMED DATES -

Tube-Mac Piping Technologies has completed the hydraulic piping installation of the tuna freezer vessel “gevred” b-305, built by astilleros de murueta for the shipowner “compagnie française du thon oceanique” (cfto)

TUBE-MAC PIPING TECHNOLOGIES (TM) has completed the prefabrication, installation and testing of the hydraulic piping for the different fishing equipments, supplied by the French manufacturer BOPP, for the tuna freezer vessel that...

Continue reading