Skip to main content
19th to 21st of May 2026
19th, 20th & 21st
MAY 2026

- CONFIRMED DATES -

Vulcano to build a vessel in Teis for its Gijón-based subsidiary as a result of the suspension of t

Factorias Vulcano have finally decided to build the new tanker at their Vigo shipyards and no, as expected, at Gijón (Factorias Juliana). The vessel in question is a seismic survey boat designed to detect pockets of oil beneath the ocean floor.